Centralized Power Distribution SystemSpecially For Construction Sites

We at Tara Genset Engineers have specially designed a centralized power distribution system for construction sites, where usually various vendors are involved and each of them has a different power requirement. We provide a common solution for all these varied requirements, a solution which is greener, safer, economical and absolutely hassle free. We call it CPD.

How CPD Works?

This is one of its own kind of set up wherein a centralized control room is set up to distribute power to all vendors at the site through their respective energy meter/hour meter. The electricity is generated through commonly used DG sets which are maintained and operated by well trained personnel. Each vendor at the site pays a fixed rent for the DG set, infrastructure and operation along with running expenses as per the usage every month.

10 Reasons to go forCentralized Power Distribution System
SAFETY

A well kept DG area and the common cable from DG sets to control room equipped with safety measures & equipment ensures no unsafe web of multiple cables.

1.
ECONOMICAL

Pay as much as you use, where, in addition to the fixed rent the customer pays the running charges only as per his usage, no more no less.

2.
DISCREET

Common/Shared DG sets & operators ensure lesser number of DG sets at the site and hence lesser space required.

3.
FLEXIBILITY

Each customer may choose a particular power usage from 3KVA to 200KVA as equired & may even change his requirement any time as per his anticipated future usage.

4.
RELIABILITY

Well maintained sound proof DG sets ensure reliable uninterrupted power supply.

5.
BACK UP

Stand-by DG sets ensure no work stoppage even if the main DG set goes faulty.

6.
NO WORRY

No Worrying of diesel/fuel theft.

7.
NO HASSLE

No need to worry for diesel transportation, we take care of it.

8.
GREEN

Common usage means Lesser pollution.

9.
OPTIONS

Power options start from as low as 3KVA.

10.